EV charging in a strata or commercial building is a capacity problem before it is a hardware problem. The chargers are the easy part. The real questions are how many cars your electrical service can feed, and how each owner gets billed fairly for what they use.
Woola Electrical is a CleanBC EV Ready certified planner. We design charging rollouts at the building level: load management, sub-metering, rebate applications, and the installation itself, from permit to energization.
EV Ready plans for strata buildings
An EV Ready plan maps how every stall in your parkade gets charging over time, without a service upgrade the building cannot afford. We model your available capacity, design the load-managed distribution, and produce the plan CleanBC requires for its rebates. Councils use it to answer the question owners keep asking: when can I charge at my stall?
Load management and billing
Load management software shares your building's spare amps across many chargers, so dozens of cars can charge overnight on capacity that would serve only a handful of unmanaged stalls. Sub-metering then bills each owner for exactly the power their car drew. We install and configure networked systems from FLO, ChargePoint, and Wallbox, and hand the billing platform to your council or manager at closeout.
What we install
- Level 2 chargers for strata stalls, workplaces, and homes
- Networked, load-managed strata charging systems
- DC fast charging for fleets and commercial sites
- Dedicated circuits and sub-panels for charging loads
- Sub-metering and billing platform setup
- BC Hydro and CleanBC rebate applications
Rebates and paperwork
CleanBC and BC Hydro both offer charging rebates, each with rules about who applies, when, and with what documentation. We file the paperwork as part of the project, so the rebate does not depend on a volunteer council member's spare evenings.
When the panel is the real problem
Some buildings genuinely lack the capacity for the charging they want, even with load management. When that is the case we say so early and scope the service upgrade honestly, because a charging rollout built on an overloaded service helps nobody.
Charging that outlasts the install
The buildings happiest with their charging five years on are the ones that planned for every stall, not just the first few. Start with the plan. The hardware follows.
Plan your charging rollout
Describe the building and what's happening. A coordinator scopes the visit before anyone rolls a truck.
604-829-9160Equipment we service.
Each unit links to a plain-English walkthrough of what it does, what fails, and what to keep an eye on.

EV Charging Station
Level 2 charging for residents, tenants, and fleets: the pedestal, the electronics inside it, and the load management that lets a building charge many cars without a service upgrade.
- ·Charging sessions that stop early
- ·Breaker trips when several cars charge
- ·Damaged cables or connectors
- Annual inspection of contactors and terminations
- Cable and connector condition checks
- Load-management settings verified against panel capacity
What is included.
What we book, deliver, and stand behind under this service line. If your scope isn't listed, ask. We probably do it.
Strata EV Ready
- ·CleanBC EV Ready plans and rebate paperwork.
- ·Load management with FLO, ChargePoint, Wallbox.
- ·Sub-meter installations and billing setup.
Commercial & fleet
- ·Workplace and retail charger deployments.
- ·Permit to energization handled.
- ·DC fast charger planning.
Residential L2
- ·BC Hydro $350 rebate eligible installs.
- ·Service-panel and load assessment.
- ·Concealed conduit and clean finish.
Recent projects.
Vault maintenanceCommercial Electrical Vault Maintenance & BC Hydro Coordination
Load managementIntelligent Load Management for Building Electrification
Operating permitsAnnual Electrical Operating Permit & Maintenance Oversight






How we handle it.
- CleanBC EV Ready certified planner
- Strata load management design
- FLO, ChargePoint, Wallbox installer
- Permit-to-energization handled
Level 2 & DC fast charging across Whistler, Squamish, West Vancouver, North Vancouver, Vancouver, Burnaby, and 12 more municipalities.
Book EV charging with Woola.
Tell us about the property and we'll get a coordinator in touch within one business day.
24/7 emergency dispatch for contracted clients